MNSi the Hut - an ongoing pictoral history

(click on picture for larger image)
Page 1 | Page 2

main menu
starting to drywall
starting to drywall
05 January 2010
drywall up with additional sound insulation awaiting install
drywall up with additional
sound insulation awaiting install
05 January 2010
working on door canopy
working on door canopy
05 January 2010
getting the gate installed on garbage containment area
getting the gate installed
on garbage containment area
05 January 2010
continuing with drywall
continuing with drywall
07 January 2010
sound insullation in studs - awaiting drywall
sound insullation in studs - awaiting drywall
07 January 2010
lighting getting installed
lighting getting installed
07 January 2010
emergency generator in place on roof
emergency generator in place on roof
07 January 2010
drywall work continues
drywall work continues
08 January 2010
reception area getting drywall completed
reception area getting drywall completed
08 January 2010
working on decorative bulkheads in Clayton's office
working on decorative bulkhead in Clayton's office
13 January 2010
drywall is done - now with the tape and plaster
drywall is done - now with the tape and plaster
13 January 2010
main entry starting to take shape
main entry starting to take shape
13 January 2010
lots of taping and mudding to do
lots of taping and mudding to do
13 January 2010
final coat of drywall plaster awaits sanding
final coat of drywall plaster awaits sanding
18 January 2010

Page 1 | Page 2

main menu