 outside sheathing continues
on west side of building
15 December 2009 |
 continuing work in new reception area
- lighting and ducts
17 December 2009 |
 outside sheathing sealed
17 December 2009 |
 continuing sheathing on west side
17 December 2009 |
 studs on exterior east side completed
17 December 2009 |
 continuing with electrical and
vacuum duct work in new section
17 December 2009 |
 natural gas generator in place on roof
21 December 2009 |
 vapour barrier up in new section
21 December 2009 |
 vapour barrier in new reception area
21 December 2009 |
 sliding main doors installed
24 December 2009 |
 OK, did they say cut the red wire or the blue wire?
24 December 2009 |
 drywall and sound insullation await installation
24 December 2009 |
 new main entry doors - operational!
24 December 2009 |