 original front and side
04 September 2009 |
 outside may have been tagged a little
04 September 2009 |
 construction brought to you by...
09 September 2009 |
 original addition removed
09 September 2009 |
 the debris starts to accumulate
04 September 2009 |
 scraping the tile floor down
04 September 2009 |
 removing the Pizza Hut roofline
09 September 2009 |
 nice siding under there
09 September 2009 |
 continuing smoothing floor
09 September 2009 |
 how the roof-line attaches
09 September 2009 |
 there will be many containers full to remove
09 September 2009 |
 continuing roof line detail
09 September 2009 |
 opening up for plumbing
11 September 2009 |
 opening up for plumbing
11 September 2009 |
 cutting out for additional windows
23 September 2009 |