MNSi the Hut - an ongoing pictoral history

(click on picture for larger image)
Page 1 | Page 2

main menu
original front and side
original front and side
04 September 2009
outside may have been tagged a little
outside may have been tagged a little
04 September 2009
construction brought to you by...
construction brought to you by...
09 September 2009
original addition removed
original addition removed
09 September 2009
the debris starts to accumulate
the debris starts to accumulate
04 September 2009
scraping the tile floor down
scraping the tile floor down
04 September 2009
removing the Pizza Hut roofline
removing the Pizza Hut roofline
09 September 2009
nice siding under there
nice siding under there
09 September 2009
continuing smoothing floor
continuing smoothing floor
09 September 2009
how the roof-line attaches
how the roof-line attaches
09 September 2009
there will be many containers full to remove
there will be many containers full to remove
09 September 2009
continuing roof line detail
continuing roof line detail
09 September 2009
opening up for plumbing
opening up for plumbing
11 September 2009
opening up for plumbing
opening up for plumbing
11 September 2009
cutting out for additional windows
cutting out for additional windows
23 September 2009

Page 1 | Page 2
main menu