temporary blocking in new windows
23 September 2009 |
rough plumbing in
23 September 2009 |
starting inside walls
24 September 2009 |
continuing inside wall prep
24 September 2009 |
outside brick cleaned up a bit
24 September 2009 |
closing in excess space
24 September 2009 |
front after roof line removed
24 September 2009 |
inside wall studs started
28 September 2009 |
continuing inside wall studs
28 September 2009 |
outside with new windows cut out
30 September 2009 |
unnecessary door closed in
30 September 2009 |