 temporary blocking in new windows
23 September 2009 |
 rough plumbing in
23 September 2009 |
 starting inside walls
24 September 2009 |
 continuing inside wall prep
24 September 2009 |
 outside brick cleaned up a bit
24 September 2009 |
 closing in excess space
24 September 2009 |
 front after roof line removed
24 September 2009 |
 inside wall studs started
28 September 2009 |
 continuing inside wall studs
28 September 2009 |
 outside with new windows cut out
30 September 2009 |
 unnecessary door closed in
30 September 2009 |