inside studs - hall
inside studs - hall
01 October 2009
inside studs - tech area
inside studs - tech area
01 October 2009
inside studs - tech manager office
inside studs - tech manager office
01 October 2009
cutting brick in prep of addition
cutting brick in prep of addition
08 October 2009
inside wiring started
inside wiring started
08 October 2009
inside network cabling started
inside network cabling started
08 October 2009
dual outlets - one for UPS
dual outlets - one for UPS
08 October 2009
inside plumbing started
inside plumbing started
08 October 2009
the basic layout
the basic layout
08 October 2009
opening where addition will be is closed in
opening where addition will be is closed in
08 October 2009
materials for roof on site
materials for roof on site
20 October 2009
starting the drywall
starting the drywall
20 October 2009
tech support drywall progressing
tech support drywall progressing
20 October 2009
electrical sub-panel
electrical sub-panel
20 October 2009
pressure testing the plumbing lines
pressure testing the plumbing lines
20 October 2009