 half wall and bulkhead in tech area
26 October 2009 |
 working on bulkhead
26 October 2009 |
 drywall taping and plastering started
26 October 2009 |
 concreting around in floor connector
26 October 2009 |
 HVAC installation progressing
26 October 2009 |
 installing conduit for network cables
26 October 2009 |
 full house today
27 October 2009 |
 insullating
27 October 2009 |
 roof materials... leaves are just a bonus
27 October 2009 |
 looking out over the footings for the addition
27 October 2009 |
 main entrance footings
27 October 2009 |
 preparing hallway for drywall ceiling
27 October 2009 |
 lots of network / communication cabling
27 October 2009 |
 wall with plastic for weatherproofing
27 October 2009 |
 full view of back