MNSi the Hut - an ongoing pictoral history

(click on picture for larger image)
Page 1 | Page 2 | Page 3 | Page 4 | Page 5

main menu
half wall and bulkhead in tech area
half wall and bulkhead in tech area
26 October 2009
working on bulkhead
working on bulkhead
26 October 2009
drywall taping and plastering started
drywall taping and plastering started
26 October 2009
concreting around in floor connector
concreting around in floor connector
26 October 2009
HVAC installation progressing
HVAC installation progressing
26 October 2009
installing conduit for network cables
installing conduit for network cables
26 October 2009
full house today
full house today
27 October 2009
insullating
insullating
27 October 2009
roof materials... leaves are just a bonus
roof materials... leaves are just a bonus
27 October 2009
looking out over the footings for the addition
looking out over the footings for the addition
27 October 2009
main entrance footings
main entrance footings
27 October 2009
preparing hallway for drywall ceiling
preparing hallway for drywall ceiling
27 October 2009
lots of network / communication cabling
lots of network / communication cabling
27 October 2009
wall with plastic for weatherproofing
wall with plastic for weatherproofing
27 October 2009
full view of back
full view of back
28 October 2009

Page 1 | Page 2 | Page 3 | Page 4 | Page 5
main menu