studs with plywood for support
studs with plywood for support
20 October 2009
marking out studs around plumbing
marking out studs around plumbing
20 October 2009
'Future Home of' sign up
'Future Home of' sign up
20 October 2009
front cleared, with sign
front cleared, with sign
20 October 2009
digging for footings of addition
digging for footings of addition
20 October 2009
outside opening where the addition will be
outside opening where the addition will be
20 October 2009
footing below wall extension
footing below wall extension
20 October 2009
footings for addition poured
footings for addition poured
22 October 2009
footings for addition poured
footings for addition poured
22 October 2009
inside insulation started (where required)
inside insulation started (where required)
22 October 2009
insulation awaiting installation
insulation awaiting installation
22 October 2009
piping for supplimentary heating
piping for supplimentary heating
22 October 2009
preparing for an in floor connector
preparing for an in floor connector
22 October 2009
materials on roof await installation
materials on roof await installation
22 October 2009
concrete poured
concrete poured
26 October 2009