 studs with plywood for support
20 October 2009 |
 marking out studs around plumbing
20 October 2009 |
 'Future Home of' sign up
20 October 2009 |
 front cleared, with sign
20 October 2009 |
 digging for footings of addition
20 October 2009 |
 outside opening where the addition will be
20 October 2009 |
 footing below wall extension
20 October 2009 |
 footings for addition poured
22 October 2009 |
 footings for addition poured
22 October 2009 |
 inside insulation started (where required)
22 October 2009 |
 insulation awaiting installation
22 October 2009 |
 piping for supplimentary heating
22 October 2009 |
 preparing for an in floor connector
22 October 2009 |
 materials on roof await installation
22 October 2009 |
 concrete poured
26 October 2009 |