 floor poured
09 November 2009 |
 diffusers are here and installed in bulkheads
09 November 2009 |
 first coat of paint under way
09 November 2009 |
 A/C condensing units mounted
on their 'big foot' stand
09 November 2009 |
 clearing out the scrub from the back
09 November 2009 |
 condensing unit for server room A/C
09 November 2009 |
 looking out over roof of addition
09 November 2009 |
 birds eye view of back of lot
09 November 2009 |
 electrical cable pulled in to main disconnect
09 November 2009 |
 beautiful marble sills
09 November 2009 |
 HVAC diffuser and POT light in washroom
09 November 2009 |
 exterior walls framed (front)
11 November 2009 |
 exterior wall frame (office)
11 November 2009 |
 plumbing for washroom and side door
11 November 2009 |
 generator transfer switch wired
11 November 2009 |