 tile work commences
11 November 2009 |
 back board in server room
11 November 2009 |
 tile down to staff entrance
11 November 2009 |
 tile down in hall between tech support and kitchen
11 November 2009 |
 bulkheads with diffusers in place
11 November 2009 |
 ledger for exterior finish attached
11 November 2009 |
 starting to close in the addition
12 November 2009 |
 starting to close in the addition
12 November 2009 |
 more clearing at back of lot
12 November 2009 |
 preparing a pad to move the containers on to
12 November 2009 |
 getting the stud wall bases laid out and installed
12 November 2009 |
 getting the stud wall bases installed
12 November 2009 |
 canopy over main entrance
13 November 2009 |
 inside wall studs started in addition
13 November 2009 |
 tile flooring continues in hall way
13 November 2009 |