 cubicles in tech support in place
26 November 2009 |
 glass in outside door
exit button visible to right
26 November 2009 |
 UPS disconnect and circuit panel
get conduit for wires
26 November 2009 |
 overhead studs for ceiling drywall
26 November 2009 |
 insullation started in addition
26 November 2009 |
 decorative bulkhead over boardroom table
26 November 2009 |
 mop sink in closet
26 November 2009 |
 toilet, sink and light fixture
installed in washroom
27 November 2009 |
 doors arrive and await installation
27 November 2009 |
 decorative bulkhead with lights plastered
27 November 2009 |
 detail on sink and faucett
27 November 2009 |
 built in shelves in mop room
27 November 2009 |
 sink and faucet in kitchen
30 November 2009 |
 starting to hang the doors
30 November 2009 |
 ceiling, lights and carpeting
in customer service area
30 November 2009 |