 exit signs installed
20 November 2009 |
 electrical pulled through floor conduit
20 November 2009 |
 finishing the floor tile at staff entrance
20 November 2009 |
 pot lights in board room ready to be put in place
20 November 2009 |
 concrete block and cement arrive
for garbage containment area
20 November 2009 |
 work progresses on garbage containment area
23 November 2009 |
 main entrance with facade nearing completion
23 November 2009 |
 reception upper curved wall studding finished
23 November 2009 |
 new circuit panel (left) for heating /cooling units
23 November 2009 |
 water meter installed
23 November 2009 |
 door frames with side-lights installed
23 November 2009 |
 tile work continues in bathrooms
23 November 2009 |
 tile work continues in bathroom
23 November 2009 |
 tech support with centre lighting in place
23 November 2009 |
 bulkhead in server room raised
for additional space
23 November 2009 |