 base for garbage bin setting up
16 November 2009 |
 parking lot and back of lot from roof
16 November 2009 |
 mock-up of bathroom tile
17 November 2009 |
 windows installed in addition
17 November 2009 |
 door frames installed
17 November 2009 |
 most of studs are in place in addition
17 November 2009 |
 continuting to work on the architectural feature
19 November 2009 |
 data cables along newly installed overhead rack
19 November 2009 |
 conduit holes cemented
19 November 2009 |
 pressure testing water lines in addition
19 November 2009 |
 bulkhead being painted white
19 November 2009 |
 patio stone walkway on roof to protect surface
19 November 2009 |
 landscaping rocks
19 November 2009 |
 continuing work on the facade of the addition
20 November 2009 |
 studs for reception upper curved wall
20 November 2009 |