 support wire and chains for lighting
and dropped ceiling
13 November 2009 |
 building UPS arrives on site
13 November 2009 |
 preparing base for garbage bin
13 November 2009 |
 concrete poured in base
13 November 2009 |
 finished closing in the addition
13 November 2009 |
 inside walls continue in addition
13 November 2009 |
 bell dmarc installed
13 November 2009 |
 grouting and tile baseboard in server room
13 November 2009 |
 building UPS out of the crates
13 November 2009 |
 framing in for sign
16 November 2009 |
 temporary wall removed
16 November 2009 |
 new section meets old
16 November 2009 |
 lighting installed
16 November 2009 |
 lighting in tech work area
16 November 2009 |
 storage containers moved
16 November 2009 |